How To - Set Capacity Option

How To - Set Capacity Option

In this video, the 'Set Capacity Option' is explained. It is about a setting that can be necsecary before starting our clustering tool. Our clustering algorithms aim to group subscribers into specific volume categories. If the Set Capacity option is not configured, the algorithms will not consider the actual fiber demand per unit.


    • Related Articles

    • How To - Set Object Status

      This video demonstrates and explains the Object Statuses an Object can have. Setting Explanation NotConnectable Objects with this status cannot be connected to other Objects. NotEditable Objects with this status cannot be changed. NotDeletable The ...
    • Release 2022

      Generic notes Numerous bugfixes; GeoWorks V2 rolled out: Complete overhaul of the existing GeoWorks with a modern, robust, and futureproof interface. Connect SubObjects V2 (pre-)released. Under further construction due to very active feedback (thank ...
    • Release 2021

      General improvements Speed of connection created using auto connectivity rules is substantial increased. In the Edit Model section the type of columns can be changed. In the Projects Panel all projects can be collapsed at once. In the Object Files ...
    • ODF tool Sort DAC not working

      For the ODF database you can use 'Sort DAC' (FTTH -> ODF contractors -> Sort DAC). Witch the 'Sort DAC' tool you can point out/set the starting point wher the splicing begins (default is 1 meter). Please image below: It First sorts on the overlapping ...
    • Splitting Distribution Ducts

      Introduction In some situations, it is convenient to use a combination of both 24 Distribution-duct and 12 Distribution-ducts. In that case, a DuctJoint can be used to split a 24 Distribution-duct into two 12-Distribution-ducts. For this lesson, we ...